Part 32 Excavating and Tunnelling

Section 443 Soil stabilization

(1) Subject to subsection (2), an employer must stabilize the soil in

(a) an excavation by shoring or cutting back, or

(b) a tunnel, underground shaft or open pit mine by shoring.

(2) An employer may stabilize the soil in an excavation, tunnel, underground shaft or open pit mine using an artificial soil stabilization technique, including freezing soil by artificial means or grouting if the process used is

(a) designed by a professional engineer to control soil conditions, and

(b) performed in accordance with the professional engineer’s specifications.

(3) A person must not use natural freezing of the soil as an alternative or partial alternative to a temporary protective structure or to stabilize the soil in an excavation, tunnel or underground shaft.