OHS Code

Published Date: July 01, 2009
Bookmark this page

Part 36 Mining

Section 533 Mine plans

An employer at a mine site must keep mine plans that include

(a) the workings surveyed, current to within 3 months of the previous survey,

(b) extensions to the workings sketched in, current to within 1 month of the previous survey,

(c) the general direction and inclination of the strata and thickness of the bed or strata being worked,

(d) the legal description of the land making up the mine operating property,

(e) a right of way on the land for a pipeline or other utility corridor, and

(f) exploration drill holes drilled for any purpose.