OHS Code Explanation Guide

Published Date: July 01, 2009
Bookmark this page

Part 37 Oil and Gas Wells

Highlights

  • Section 751 lists minimum competency requirements for supervisors of exploration, drilling, servicing, snubbing, testing and production operations.
  • Section 759 allows service rig trucks to exceed their manufacturer-specified load weights if the listed conditions are met.
  • Section 760 lists specific requirements for rigging up.
  • Section 764 lists new requirements for ground anchor pull-testing.
  • Sections 779 and 780 present new requirements that deal with fluid recovery during darkness.
  • Section 837 presents requirements for securing pressurized piping.